| ماهنامه| ISC | فنی،مدیریتی،حقوقی| اعتبار،چابکی،پاسخگویی|
مهندسی عمران-سازه های هیدرولیکی
study of numerically ability to estimate scouring around bridge piers in extreme rainfall conditions

روزبه اقامجیدی؛ اامیر کمانبدست

مقالات آماده انتشار، پذیرفته شده، انتشار آنلاین از تاریخ 28 فروردین 1403

https://doi.org/10.22034/cpj.2024.452007.1268

چکیده
  In this study, the effect of change of flow discharge on the scouring around the piers of the fifth bridge of Dezful was investigated using the Hsec-RAS numerical model. For this purpose, a hydraulic model was created from the range of the river in which the bridge is located in the software by using field data. Then, by entering the data on the scouring of the bridge bases for the discharge of 25 to 1850 m3/s with different time steps, the effect of change of flow discharge on the scour around the middle and lateral piers of the bridge was investigated. The results of numerical model show a trend ...  بیشتر

مهندسی عمران-سازه های هیدرولیکی
Study & forecasting the environmental effective parameters for infra structure water transmission line project (Case study: water pipe line to south eastern industrial company)

روزبه اقامجیدی؛ علیرضا اتحاد نیا

دوره 6، شماره 1 ، فروردین 1403، ، صفحه 46-61

https://doi.org/10.22034/cpj.2024.443141.1264

چکیده
  The purpose of this research is to predict the environmental effects of the water transmission line project on the environment. The research method is descriptive and analytical using existing resources. Investigations showed that in the design of the water transmission line, the implementation of environmental considerations can play an effective role in controlling and reducing the harmful effects of the environment. Therefore, it is necessary to strictly implement measures and solutions to reduce environmental effects in water transfer areas. This is suggested by carrying out preferential environmental ...  بیشتر

Influential study of differential parameters in order to election of the type of special pumping stations and the suitable electric pumps

روزبه اقامجیدی

دوره 5، شماره 6 ، شهریور 1402، ، صفحه 11-34

https://doi.org/10.22034/cpj.2023.408120.1217

چکیده
  The pumping station is a collection of pumps, driving forces and auxiliary equipment e.g., collector system, power supply system, and control and protection systems. Small pumping stations are usually designed in the simplest possible way for the ease of operation of auxiliary equipment. However, as the capacity of the pumping station increases, the technical complexity and design of peripheral equipment increases, which requires its own design according to the conditions, type of work, and location of the project. The choice of the type of station building, the type and capacity of the main and ...  بیشتر

The long term effect of hammer influenced in water pipe line (Case study: pipeline from Azadi to Hor)

روزبه اقامجیدی

دوره 4، شماره 12 ، اسفند 1401، ، صفحه 11-24

https://doi.org/10.22034/cpj.2023.387522.1181

چکیده
  r, it is vital for preserving water resource in each area. In the meantime, Iran has been in a state of inaccurate crisis due to the excessive withdrawal of water resources. Therefore, it is important to maintain water resources. And, the traditional methods of water transfer (using open channels and ...) are replaced by new methods such as the use of a water supply pipe. These methods, in addition to cost, have many technical benefits. Including increased transmission efficiency, reduced water waste, as well as saving passive defense principles.Meanwhile, the use of GRP pipes, in the last 40 years, ...  بیشتر

Investigating the ways of using sand materials in compacted layers in the irrigation and drainage network (case study fiber glass pipe)

روزبه اقامجیدی؛ امیر کمانبدست

دوره 4، شماره 11 ، بهمن 1401، ، صفحه 11-22

https://doi.org/10.22034/cpj.2023.387965.1183

چکیده
  The discussion of earthworks and irrigation and drainage projects is very important from a technical and economic point of view. In the Southwest Khuzestan pipeline project with 230 kilometers of G.R.P. pipes, it is effective to provide the volume of earth materials for earthling around the pipe and also earthling to ensure the depth of the trench before trenching. Due to the presence of sand materials in the region, in this research, these materials were used in earthworks around the pipe in different ways, including compaction by compactor and also compaction by flooding method, and the results ...  بیشتر

Investigating the impact of the vortex breaker on the hydraulics of the flow (empirical hydraulic coefficient ) passing over the morning glory spillway

روزبه اقامجیدی

دوره 4، شماره 9 ، آذر 1401، ، صفحه 53-72

https://doi.org/10.22034/cpj.2023.391020.1186

چکیده
  In recent decades, many dams have been built. Due to the high need for water and the increasing soil erosion in different areas, the need to build a dam is quite obvious. In 1900, the number of large dams did not exceed 50. However, between 1950 and 1986, the number of large dams (more than 15 meters high) was more than 39,000. Since the 70s, the construction of dams has been developing more and more. This expansion has been more visible in the Asian, Central and South American regions. According to the construction purpose, each dam structure must be able to pass the volume of excess water caused ...  بیشتر