| ماهنامه| ISC | فنی،مدیریتی،حقوقی| اعتبار،چابکی،پاسخگویی|
مدیریت ساخت و مدیریت پروژه
Engineering and management, value for key indicators of project success: digital twin in automatic monitoring and controlling of construction

امیرحسین دلیر؛ حسن جوانشیر

مقالات آماده انتشار، پذیرفته شده، انتشار آنلاین از تاریخ 02 اردیبهشت 1403

https://doi.org/10.22034/cpj.2024.452473.1271

چکیده
  This study evaluates the impact of Digital Twin (DT) technology on project success metrics—specifically time, cost, quality, and safety—within the automated monitoring and control of construction projects. Employing a mixed-methods approach, the research integrates survey data, Structural Equation Modeling (SEM), case analysis, and qualitative insights from interviews and focus groups. A novel DT-based Progress Monitoring Management Model (DRX) is proposed and assessed, leveraging reality capture and Extended Reality (XR) technologies to streamline construction oversight. Findings reveal ...  بیشتر

تاثیر انتخاب ECC "کامپوزیت سیمانی مهندسی شده"در مدیریت پروژه ساخت

امیرحسین دلیر؛ آزاده علایی؛ مریم قنبرپور

دوره 2، شماره 8 ، آبان 1399، ، صفحه 11-21

چکیده
  از آنجائیکه دستیابی به هدف در اجرای پروژه های عمرانی بر چند پایه محکم، مدیریت، بودجه، زمان، نیروی انسانی و ... واقع گردیده است و این هدف وقتی به خوبی محقق می گردد که هر کدام ویژگی معیار پروژه را داشته باشند، آنگاه طرح مورد نظر و ایده کارفرما در مدت دیده شده به بهره برداری خواهد رسید و در اختیار بهره برداران که عمدتا عموم مردم هستند قرار ...  بیشتر