مدیریت ساخت و مدیریت پروژه
Effective items in site mobilization for EPC contracts and industrial projects

Hooman Shokravi; Behnam Taghavi

Volume 4, Issue 8 , November 2022, , Pages 37-47

https://doi.org/10.22034/cpj.2023.380815.1170

Abstract
  In general, the start of a large-scale construction and industrial project requires the preparation and supply of several prerequisites at the management and plant in the higher levels. At the plant levels, these prerequisites are anticipated in the form of a work package called site mobilization, from ...  Read More