Evaluation of Principal Components When Selecting Subcontractors to Preserve Quality and Reduce Project Time Using Neural Networks

Document Type : Research Article

Author

Khaje nasir

Abstract
Abstract
The increasing momentum of the development process has led to the selection of a suitable contractor as an important factor in the success of projects. Due to the considerable quantity of construction budget in countries that are developing, particular attention should be paid to subcontractor selection to avoid wasting capital, time and reducing quality of work. Subcontractor selection is one of the Basic decisions of managers and decision makers. There is not currently the method of efficient and modern management approach to contractor selection and no attention is paid to scientific methods and techniques. Identifying and evaluating a set of contractor selection criteria will eliminate inefficient contractors from the bidding process. Criteria need to be collected and processed to increase the performance of selected contractors and preparing the needs of the community and the organization's standards. Obviously, there are many qualitative and quantitative indicators to determine the qualifications of contractors, including the ability to do the job, the economic value, the quality, etc. that are important to employers. The purpose of this study is to minimize the losses caused by inappropriate selection of subcontractor and to present a suitable method for selecting subcontractor. In the neural network approach, models for efficient and effective prediction of subcontractor are selected based on the criteria. The most important advantage of radial neural networks over back propagation (BP) conventional networks is the accuracy and speed of approximation in the output of network.

Keywords

1. Bakhshi, Mehdi, Hosseinali Pourmojibi, & Ataei-Yazd, Mohammadreza. (2018). Weighting a New Classification of Contractor Selection Criteria Using the Fuzzy Analytic Hierarchy Process (FAHP). [In Persian].
2. Panahi, Javad. (2018). Identification of Effective Criteria for Contractor Selection in Civil Engineering Projects Using the Fuzzy PROMETHEE Method. [In Persian].
3. Jamali, Mehdi. (2018). Identification and Ranking of Effective Criteria for the Selection of Civil Engineering Contractors in South Zagros Oil and Gas Company. [In Persian].
4. Jahandoust, Bentolhoda. (2015). Evaluation and Selection of Contractors Using Artificial Neural Networks in Bushehr Province Water and Wastewater Company. [In Persian].
5. Khatamipour, Mehdi. (2018). Designing a Mathematical Model for Evaluating and Selecting Contractors for Gas Company Civil Engineering Projects by Integrating the AHP Method and Fuzzy Logic. [In Persian].
6. Rostami, Mohammad. (2015). Application of Fuzzy Multi-Criteria Analysis in the Selection of Subcontractors in Civil Engineering Projects. Master’s Thesis in Civil Engineering. [In Persian].
7. Ravanshadnia, Mehdi. (2016). Principles, Regulations, and Methods of Contract Management in Civil Engineering Projects. Tehran: Simaye Danesh. [In Persian].
8. Ravanshadnia, Mehdi. (2016). Development of a Model for Predicting Tender Scores in Three-Party Contracts Using Artificial Neural Networks. [In Persian].
9. Sedaghat, Anoushirvan. (2019). Evaluation and Ranking of Factors Affecting Contractor Selection in Shiraz Urban Railway Projects Using FAHP Multi-Criteria Decision-Making Techniques. [In Persian].
10. Abedi, Ali. (2019). Design and Development of a Model for Factors Affecting Contractor Selection in Project Environments. [In Persian].
11. Abbasi, Hossein. (2017). Evaluation and Prioritization of Contractors for Railway Construction Projects Using the AHP Method. [In Persian].
12. Ghorbani, Ali. (2016). A Radial Basis Function Neural Network-Based Model for Evaluating Factors Contributing to Contractor Claims in Construction Projects. Doctoral Dissertation. [In Persian].
A. Cheaitou, R. Larbi , and B. Al Housani , “Decision making framework for tender evaluation and contractor selection
in public organizations with risk considerations,” Socioecon. Plann. Sci., (8102).
D. Karabasevic, D. Stanujkic, S. Urosevic, and M. Maksimovic, “Selection of candidates in the mining industry based on
the application of the SWARA and the MULTIMOORA methods.,” Acta Montan. Slovaca, vol. 81, no. 8, 8105
D. Puri and S. Tiwari, “Evaluating the criteria for contractors‟ selection and bid evaluation,” Int. J. Eng. Sci. Invent., vol.
3, no. 7, pp. 44–42, (8104).
Mohamed M. Marzouk , Mostafa Khalifa , Housing and Building National Research Center HBRC Journal „Factors
influencing sub-contractors selection in construction projects‟(8113).
Vladislavas Kutut, Poznan-Puszczykowo , Poland Selection Criteria For Evaluating Contractors Of Cultural Heritage
Objects , (8107)
  • Receive Date 10 February 2020
  • Revise Date 17 February 2020
  • Accept Date 18 March 2020
  • First Publish Date 18 March 2020
  • Publish Date 20 February 2020