Babu, A. J. G., & Suresh, N. (1996). Project management with time, cost, and quality considerations. European
Journal of Operational Research, 88(2), 323–323.
Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2314). Time-cost trade-offs in resource-constraint project
scheduling problems with overlapping modes. International Journal of Project Organisation and
Management, 6(3), 215–236.
Chen, S.-P., & Tsai, M.-J. (2311). Time--cost trade-off analysis of project networks in fuzzy environments.
European Journal of Operational Research, 212(2), 386–393.
El-Rayes, K., & Kandil, A. (2335). Time-cost-quality trade-off analysis for highway construction. Journal of
Construction Engineering and Management, 131(4), 433–486.
Eshtehardian, E., Afshar, A., & Abbasnia, R. (2339). Fuzzy-based MOGA approach to stochastic time--cost
trade-off problem. Automation in Construction, 18(5), 692–331.
Kerzner, H. (2339). Project Management: A Systems Approach to.
Khang, D. B., & Myint, Y. M. (1999). Time, cost and quality trade-off in project management: a case study.
International Journal of Project Management, 13(4), 249–256.
Russell, S. (2333). ISO 9333: 2333 and the EFQM excellence model: competition or co-operation? Total
Quality Management, 11 (4–6), 653–665.
Tareghian, H. R., & Taheri, S. H. (2336). On the discrete time, cost and quality trade-off problem. Applied
Mathematics and Computation, 181(2), 1335–1312.
Tavana, M., Abtahi, A.-R., & Khalili-Damghani, K. (2314). A new multi-objective multi-mode model for
solving preemptive time--cost--quality trade-off project scheduling problems. Expert Systems with
Applications, 41(4), 1833–1846.
Xu, J., Zheng, H., Zeng, Z., Wu, S., & Shen, M. (2312). Discrete time--cost--environment trade-off problem for
large-scale construction systems with multiple modes under fuzzy uncertainty and its application to
Jinping-II Hydroelectric Project. International Journal of Project Management, 33(8), 953–966