[1] Khasal, T., Saghaei, A., Khalilzadeh, M., & Soltani, R. (2016). Beyond EVM: A Comprehensive Structure of Integrated
Cost, Program, Quality and Risk Control. 12th International Conference on Project Management, Tehran. [Persian]
[2] Walker, A. (2015). Project management in construction. John Wiley & Sons.
[3] Oberlender, G. D. (2014). Project management for engineering and construction. McGraw-Hill Education.
[4] Batselier, J., & Vanhoucke, M. (2015). Construction and evaluation framework for a real-life project
database. International Journal of Project Management, 33 (3), 697-710.
[5] Mahmoudi, A., & Kalantari, B. (2015). Evaluating the progress of projects using the acquired value method EVM.
National Conference on Urban Architecture and Tourism Sustainable Urban Development, Qazvin. [Persian]
[6] Kim, B. C. (2016). Probabilistic evaluation of cost performance stability in earned value management. Journal of
Management in Engineering, 32 (1), 04015025.
[7] Mishakova, A., Vakhrushkina, A., Murgul, V., & Sazonova, T. (2016). Project control based on a mutual application of
pert and earned value management methods. Procedia engineering, 165 , 1812-1817.
[8] Chang, C. J., & Yu, S. W. (2018). Three-variance approach for updating earned value management. Journal of
Construction Engineering and Management, 144 (6), 04018045.
[9] Ansari, R., & Amin Ranjbar, A. (2018). A Study of Integrated Approaches to Earned Value Management and Risk
Management in Estimating the Cost and Time of Construction Projects, International Conference on Civil Engineering,
Architecture and Urban Development Management in Iran, Tehran.
[10] Miguel, A., Madria, W., & Polancos, R. (2019, April). Project Management Model: Integrating Earned Schedule,
Quality, and Risk in Earned Value Management. In 2019 IEEE 6 th International Conference on Industrial Engineering and
Applications (ICIEA) (pp. 622-628). IEEE.
[11] Sutrisna, M., Pellicer, E., Torres-Machi, C., & Picornell, M. (2020). Exploring earned value management in the
Spanish construction industry as a pathway to competitive advantage. International Journal of Construction
Management, 20 (1), 1-12.
[12] Bruce, G. (2021). Progress Monitoring and Control. In Shipbuilding Management (pp. 185-196). Springer, Singapore.
[13] Babar, S., Thaheem, M. J., & Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value
management. Journal of Construction Engineering and Management, 143 (3), 04016104.
[14] Abdi, A., Taghipour, S., & Khamooshi, H. (2018). A model to control environmental performance of project
execution process based on greenhouse gas emissions using earned value management. International Journal of Project
Management, 36 (3), 397-413. [Persian]
[15] Kerkhove, L. P., & Vanhoucke, M. (2017). Extensions of earned value management: Using the earned incentive
metric to improve signal quality. International Journal of Project Management, 35 (2), 148-168.
www.cpjournals.com ISSN:6262-155X )Civil & Project Journal)CPJ(( نشریه عمران و پروژه
ؾبل ز مٍ، ز ضٍ 2، قوبض 11 ، ث وْی 1399 ،قوبض پ ب٘پ 21 ،نفح 31 تب نفح 41
33
[16] Moradi, N., Mousavi, S. M., & Vahdani, B. (2017). An earned value model with risk analysis for project management
under uncertain conditions. Journal of Intelligent & Fuzzy Systems, 32 (1), 97-113. [Persian]
[17] Picornell, M., Pellicer, E., Torres-Machí, C., & Sutrisna, M. (2017). Implementation of earned value management in
unit-price payment contracts. Journal of Management in Engineering, 33 (3), 06016001.