Akbarzadeh Bengar, H. & Mahmoudi, B. (2017). Prioritize the risks of the municipal sewage
construction project. The 1 st International Conference on Recent Progresses in Civil Engineering,
Shomal University, Amol, Mazandaran, Iran. (In Persian)
doi:10.1016/j.aej.2018.10.018
Dorri, B; Hamzaei, A. (2010). Determining risk response strategy in risk management by ANP
technique (case study: North Azadegan oil field development project). (pp. 75-92). Tehran: Industrial
Management.
Eskander, R. F. A. (2018). Risk assessment influencing factors for Arabian construction projects using
analytic hierarchy process. Alexandria Engineering Journal, 57(4), 4207-4218.
Haj Shirmohammadi, A. (2015). Project management and control. Isfahan: Arkan Danesh
Publications.
Nazari,A; Forsatkar,A. (2008). Risk management in projects. Tehran: Publications of Management
and Planning Organization.
PMBOK. (2004). A Guide To The Project Management Body Of Knowledge(PMBOK Guide). usa:
project management institute inc.
Saati, T. (2004). Fundamentals of the analytic network process - Dependence and feedback in
decision-making with a single network. Journal of Systems Science and Systems Engineering ,1-35.
Sheikh, M. (2005). Investigating the application of risk management in power plant projects. Tehran:
Faculty of Arts, Tarbiat Modares University.
Steffen, B. (2018). The importance of project finance for renewable energy projects. Energy
Economics, 69, 280-294.
Tasa, O., Gulabchi , M. & Ravanshadnia, M. (2023). Evaluating the Response to Risks in Complex
Construction Projects Using the Fuzzy TOPSIS Method. Industrial management journal, 15(2), 335-364
doi:10.22059/imj.2023.352751.1008010 (in Persian)
Valipour, A. e.(2013). Analytic Network Process (ANP) to Risk Assessment of Gas Refinery EPC
Projects in Iran . journal of Applied Sciences Research, (3)9 :1359-1365.
Wu, Y., Zhang, B., Xu, C. & Li, L. (2018). Site selection decision framework using fuzzy ANPVIKOR
for large commercial rooftop PV system based on sustainability perspective. Sustainable Cities
and Society, 40, 454-470.
Yang, Y. P. O., Shieh, H. M. & Tzeng, G. H.( 2013). A VIKOR technique based on DEMATEL and
ANP for information security risk control assessment. Information Sciences, 232, 482-500.
Yazdani, M. (2007). Investigating the time risks of constructing intra-urban highways in Tehran.
Tehran: Shahid Beheshti University.