Identification and Prioritization of Contractor Selection Criteria in EPC Contracts Using AHP and Topsis Methods

Document Type : Research Article

Author

construction management, asihe university

Abstract
The first studies to choose contractors in EPC contracts are back in the years ahead. Studies have shown that the existence of a contractor in EPC contracts is considered to be important for contractors and reduces risk, cost, and overall improvement of project objectives. General contractors have limited workload in specialized disciplines and it is inefficient to take full-time specialized labor force and carry out the operation, maintenance and control of specialized machinery with a high cost for them. As a result, contractors in EPC contracts that specialize in one or more specific fields of activity will be able to perform specialized work at a lower cost and higher quality. This research, using two qualitative and quantitative approaches, identifies and prioritizes selection criteria for contractors, which was done through interviewing AHP and topsis methodology. The results indicated that 12 factors such as executive, financial and engineering teams are involved in contractor selection in EPC contracts.

Keywords

1. Shakeri Eghbal, Jafari, Mostafa & Shakeri, Arnoosh. (2005). Project Execution Method Selection Model Using the AHP Approach. Second International Conference on Project Management, Tehran. [In Persian].
2. Ranjbaran, Saeed & Sobhiyeh, Mohammad Hossein. (2004). Investigation of the Management Contracting System in an Industrial Project. First International Conference on Project Management, Tehran. [In Persian].
3. Asgharizadeh, Ezzatollah & Nasrollahi, Mehdi. (2008). Identification and Weighting of Effective Criteria for the Selection of Contractors in Civil Engineering Projects. Quarterly Journal of Management Research, Vol. 1, No. 2. [In Persian].
4. Shirviyeh-Zadeh, Hadi, Ranji, Saeed & Karimi, Ayar. (2014). Contractor Selection Using the Analytic Hierarchy Process for Sustainable Development: A Case Study of Iranian Offshore Oil Company. [In Persian].
5. Lin, Y., Lee, P., Chang, T. & Ting, H. (2008). Multi-Attribute Group Decision Making Model under the Condition of Uncertain Information. Journal of Automation in Construction, Vol. 17.
6. Iran-Nejad Parizi, Mehdi. (2011). Research Methods in Social Sciences. Tehran: Modiran Publishing. [In Persian].
[7] GudienÄ—a, Neringa & BanaitienÄ—a Nerija, 2184, Identification and evaluation of the critical success factors for
construction projects in Lithuania: AHP approach, Journal of Civil Engineering and Management
  • Receive Date 30 June 2019
  • Revise Date 05 July 2019
  • Accept Date 10 July 2019
  • First Publish Date 21 July 2019
  • Publish Date 21 July 2019