identify the problem and complaints of the employer and the contractor and reasons for it in "maskan mehr "

Document Type : Research Article

Author

alaodole semnani garmsar

Abstract
In this research, it was tried to use the experience of building construction and activity in housing projects to identify the reasons for the discrepancy between employers and contractors in Mehr Housing Segment. To collect data, library study method and questionnaire distribution were used among contractors, employers and engineers involved in Mehr Housing Projects. This research is a summary of a dissertation under this title, which was conducted using descriptive survey method. From the findings of this research, it is possible to identify the important reasons for the disagreement and the roots of the lawsuits between employers and contractors in Mehr Housing. The purpose of collecting this information has ultimately been to assist contractors and employers in all disciplines in order to minimize financial damages and consequently increase the quality and efficiency of the specialized forces.

Keywords

8- Shakeri, eghbal and Ghorbani, ali. (8984). The second project management conference,ccc in project
management.
2- Dehghani, reza. (8998). Identification and rooting of critical factors of the claim the time and cost from
the perspective of employer and, consultant and contractor.
9- Fesharaki fard, Masood. (8999). Providing new solution for managing and contracting construction
management perspective.
4- Abbaszadeh, gholamreza. (8999). Pathologhy of house building projects in iran, page
9- Eghtesadnews, (8997). www.https//www. Eghtesadnews.com
6- The book of labor law.
وشزیٍ عمزان ی پزیژٌ com.cpjournals.www
ؾاَ اَٚ، قٕاضٜ 2 ،ت٥ط 8998
52
7- Constitutional book
  • Receive Date 05 July 2019
  • Revise Date 08 July 2019
  • Accept Date 19 July 2019
  • First Publish Date 21 July 2019
  • Publish Date 21 July 2019