Review and Prioritize of clients based sources on civil project contractor’s claim .

Volume 1, Issue 5 - Serial Number 5
October 2019
Pages 23-37

Document Type : Research Article

Author

head of technical supervision office

Abstract
ABSTRACT
The advancement of human societies and the increase in population have led to the increasing need for larger and more complex buildings and facilities. Consequently, it is necessary to form PDS teams and structures. Increased involvement of project stakeholders and changes in risk sharing and conflict of interest and conflict between their rights has led to claims. The present article attempts to provide a summary of claims and legal bases, in particular the employer claims of construction project contractors based on existing literature in Iran and the world, analyze the results and. Prioritize factors for climate (of employer origin)
. In addition, the process of dealing with claims was studied and after examination it was found that the most frequent and severely influenced factors for claim were related to the client's request for changes, followed by additional work factors and delays. Among the ways to deal with the claim made by the contractors was the best way to negotiate. Jurisdiction and referral are next, with only a small percentage of disputes settled through the court. (Almost 6%)

Keywords

1. Bahadori, Esmaeil, & Radkia, Sirous. (2017). Investigation of Claims and Determination of the Impact of Reducing Contractors’ Claims on the Time and Cost of Civil Engineering Projects: A Case Study of Construction Projects of Khuzestan Regional Power Lines. 4th Conference on Construction and Project Management, Tehran. [In Persian].
2. Shakeri, Eghbal, & Ghorbani, Ali. Project Management and Identification of the Major Causes of Contractors’ Claims in Civil Engineering Projects. 12th International Conference on Project Management, Tehran. [In Persian].
3. Shakeri, Eghbal, & Ghorbani, Ali. (2015). Project Management and Identification of the Major Causes of Contractors’ Claims in Civil Engineering Projects. 2nd International Conference on Project Management, Tehran. [In Persian].
4. Shakeri, Eghbal, & Reza Zadegani, Akbar. Identification and Prioritization of Types of Contractors’ Claims in Civil Engineering Projects. 2nd Urban Management Conference, Tehran. [In Persian].
5. Thomas, Reg. Claims Management in Construction Projects. Translated by Hossein Naderi. Tehran: Ketab Mehrgan Publications. [In Persian].
6. Parsaei, Alireza, & Dini, Abbas. Identification of Contractors’ Claims in Civil Engineering Projects: A Case Study of the South Tehran Wastewater Treatment Plant Project. 12th International Conference on Project Management, Tehran. [In Persian].
7. Parchami Jalal, Majid, & Darvish Rokn-Abadi, Mohammad. (2013). Investigation of Contractual Claims and Their Legal Regulations. University of Tehran, Tehran. [In Persian].
8. Mian-Mahalleh, Mohammad Mehdi. (2015). Investigation of Types of Claims and the Reasons for Their Occurrence in Civil Engineering Projects. 2nd Conference on Construction and Project Management, Tehran. [In Persian].
9. Ghorbani, Masoud, & Salahshour, Jamshid. (2014). 1st National Conference on Architecture, Civil Engineering and Urban Environment, Hamedan. [In Persian].
10. RouholElm, Vahid, & Rashidi, Ali. (2018). Claims Management and Delay Analysis in Construction Contracts. Tehran: Adibeh Publications. [In Persian].
Claim Management – SAP AG – April 1002
Construction Contract Claim Settlements – Thomas F. Barry – Florida Department of Transportation- June 1000
Essam Zaneldin - CONSTRUCTION CLAIMS IN THE UNITED ARABEMIRATES: TYPES, CAUSES, AND
FREQUENCY
Helder Moura2 and José Cardoso Teixeira1 - TYPES OF ONSTRUCTION CLAIMS: A
PORTUGUESESURVEY-portugal-1002
Iwona Rybka 2, Elżbieta Bondar-Nowakowska2, Katarzyna Pawluk 1, MieczysławPołoński - Risk of
Contractors’ Claims On the Example of Road Works- 1002- poland
M. Coombes Davies. Avoiding Claims: A Practical Guide to Limiting Liability in the LONDON. NEW YORK
Mohammed Al Mohsin- Claim Analysis of Construction Projects in Oman- 1021- oman
Robert c. Khrl. (1022). Patent claim construction. US: Wulters Kluwer.
Robert f Cushman. John d carter .Paul j Gorman. proving and pricing construction claims . US: Wulters Kluwer.
  • Receive Date 05 October 2019
  • Accept Date 16 October 2019
  • First Publish Date 16 October 2019
  • Publish Date 23 September 2019