Review and Prioritize of clients based sources on civil project contractor’s claim with using PROMETHEE method in Tehran regional electricity company.

Document Type : Research Article

Author

head of technical supervision office

Abstract
In the present article, while providing a brief definition of the claim and its legal bases, it has tried to specifically address the source of the employer's claims of the contractors of construction projects based on the texts in the Iranian and world civil literature and especially the source of claims in the Tehran regional electricity company (trec), we have studied and weighed them with critic technique and analyzed the results and prioritized the factors of claim bases by multi-criteria decision making Studies show that in Tehran Regional Electricity Company, the source of inaccuracy of the initial estimate of the work performed by the employer (D4) with a total current of 0.6574 is the main source of claim in this company. After that, the exchange rate changes and the jump in the price of materials (B5) are in the second place. As a possible source, the topic was included in 33 questions and, incidentally received a high rating. However, the employer can reduce the vulnerability of the project by placing clauses in the contract, such as adjusting the exchange rate, etc., to the detriment of the project. If we ignore issues that are beyond the control of the employer, such as unforeseen events and sanctions that rank third. The low accuracy of estimating the appropriate time for the project by the employer agents with a net total current of 0.5216 is in the fourth place. In addition, the best way to negotiate was identified between the ways of reviewing and handling the claims made by the contractors (dispute resolution), and mediation, judgment and referral to the judicial authorities based on the research background are in the next ranks and only a small percentage. (About 6%) of the disputes have been settled by the court.

Keywords

Ghorbani, A., Ghorbani, A., & Ghorbani, M. (2007). Contractors' Claims in Tehran. Tehran: Goharshad Publications.
Rouholamin, V., & Rashidi, A. (2013). Claim Management and Delay Analysis in Construction Contracts. Tehran: Adibeh Publications.
Tavassoli, R., & Naderi, H. Claim Management in Construction Projects. Tehran: Ketab-e Mehraban Publications.
Shakeri, E., & Zadegan, A. R. Identification and Prioritization of Different Types of Contractors' Disputes in Civil Engineering Projects. Second Urban Management Conference, Tehran, Iran.
Mian Mahalleh, M. M. (2015). Investigation of Types of Claims and the Reasons for Their Occurrence in Civil Engineering Projects. Second Conference on Construction and Project Management, Tehran, Iran.
Shakeri, E., & Ghorbani, A. (2015). Project Management and Identification of the Major Causes of Contractors' Claims in Civil Engineering Projects. Second International Conference on Project Management, Tehran, Iran.
Parchami Jalal, M., & Darvish Rokn Abadi, M. (2013). Contractual Claims and Their Legal Regulations. University of Tehran, Tehran, Iran.
Parsaei, A., & Dabini, A. Identification of Contractors' Claims in Civil Engineering Projects: A Case Study of the South Tehran Wastewater Treatment Plant Project. Twelfth International Conference on Project Management, Tehran, Iran.
Shakeri, E., & Ghorbani, A. Project Management and Identification of the Major Causes of Contractors' Claims in Civil Engineering Projects. Twelfth International Conference on Project Management, Tehran, Iran.
Bahadori, E., & Radkia, S. (2017). Investigation of Claims and Determination of the Effect of Reducing Contractors' Claims on the Time and Cost of Civil Engineering Projects: A Case Study of Construction Projects of Khuzestan Regional Power Lines. Fourth Conference on Construction and Project Management, Tehran, Iran.
Ghorbani, M., & Salahshour, J. (2014). First National Conference on Architecture, Civil Engineering and Urban Environment. Hamedan, Iran.
Robert c. Khrl. (5412). Patent claim construction. US: Wulters Kluwer.
Robert f Cushman. John d carter .Paul j Gorman. Proving and pricing construction claims.
US: Wulters Kluwer.
M. Coombes Davies. Avoiding Claims: A Practical Guide to Limiting Liability in
the LONDON. NEW YORK
Claim Management – SAP AG – April 5441
Construction Contract Claim Settlements – Thomas F. Barry – Florida Department of
Transportation- June 5444
Helder Moura1 and José Cardoso Teixeira5 - TYPES OF ONSTRUCTION CLAIMS: A
PORTUGUESESURVEY-portugal-544.
www.cpjournals.com ISSN:6262-155X )Civil & Project Journal)CPJ(( پروژه و عمران نشریه
ؾبَ زْٚ، زٚضٜ 2 ،قٕبضٜ 7ٔ ،ٟط 1399،قٕبضٜ پیبپی 17،نفحٝ 34تب نفحٝ 60
34
Iwona Rybka 1, Elżbieta Bondar-Nowakowska1, Katarzyna Pawluk 5, MieczysławPołoński -
Risk of Contractors’ Claims On the Example of Road Works- 5442- poland
Mohammed Al Mohsin- Claim Analysis of Construction Projects in Oman- 5415- oman
Essam Zaneldin - Construction claims in the united Arab emirates: types, causes, and
frequency
  • Receive Date 21 September 2020
  • Accept Date 21 October 2020
  • First Publish Date 21 October 2020
  • Publish Date 22 September 2020