1. Aliverdi, R., Moslemi Naeni, L., & Salehipour, A. (2013). Monitoring project duration and cost in a construction project by applying statistical quality control charts. International Journal of Project Management, 31(3), 411–423.
2. Amini, M., Nohani, E., & Noorolah Dezfouli, M. H. (2024). Identification and ranking of factors influencing the non-implementation of risk management in small-scale civil projects (case study: Civil projects in the city of Abadan). Civil and Project Journal, 5(12), 11–28. https://doi.org/10.22034/cpj.2024.434589.1252 [persian]
3. Ateş, B., & Eirgash, M. A. (2025). Proactive and data-driven decision-making using earned value analysis in infrastructure projects. Buildings, 15(14), 2388.
https://doi.org/10.3390/buildings15142388
4. Barkhordari Dashtkhaki, A., & Tabatabaei Mirhosseini, R. (2025). Identification and prioritization of influential criteria in achieving the program scheduling in construction projects. Civil and Project Journal, 7(4), 11–28. [Persian]
5. Duc, N. A. (2025). Risk-based earned value management with cost–time mutual effect to enhance construction forecasts and management. Journal of Science and Technology in Civil Engineering, 19(2), 62–77. https://doi.org/10.31814/stce.huce2025-19(2)-05
6. Elsaid, M., Nassar, K., Alqahtani, F. K., & Abotaleb, I. (2025). Comparative analysis of earned value management techniques in construction projects. Scientific Reports, 15, 23606. https://doi.org/10.1038/s41598-025-05834-z
7. Fleming, Q. W., & Koppelman, J. M. (2010). Earned value project management (4th ed.). Project Management Institute.
8. Kim, B.-C., Kim, H.-J., & Park, H.-S. (2015). Integrated CO2, cost, and schedule management system for building construction projects using the earned value management theory. Journal of Cleaner Production, 103, 275–285.
https://doi.org/10.1016/j.jclepro.2014.05.031
9. Mostofi, F., Tokdemir, O. B., & Toğan, V. (2026). Bidirectional spatio-temporal networks for predicting cost performance in construction using deep learning extension of earned value management. Automation in Construction, 181, 106597.
https://doi.org/10.1016/j.autcon.2025.106597
10. Ngo, K. A., Lucko, G., & Ballesteros-Pérez, P. (2022). Continuous earned value management with singularity functions for comprehensive project performance tracking and forecasting. Automation in Construction, 143, 104583.
https://doi.org/10.1016/j.autcon.2022.104583
11. Ottaviani, F. M., Ballesteros-Pérez, P., & Narbaev, T. (2025). Automated machine learning pipeline for robust project cost and duration forecasting. Automation in Construction, 178, 106426. https://doi.org/10.1016/j.autcon.2025.106426
12. Panquet, Q., Bourgault, M., Pellerin, R., Danjou, C., & Perrier, N. (2024). A process-improvement method for implementing earned value–based project management in organizations. Journal of Construction Engineering and Management, 150(12).
https://doi.org/10.1061/JCEMD4.COENG-15041
13. Project Management Institute. (2019). The standard for earned value management.
14. Rostampour, D., & Mazhari, M. Y. (2024). Evaluation of the effect of project management based on knowledge on risk management in Mehr housing projects of Sanandaj. Civil and Project Journal, 6(10), 11–26. [Persian]
15. Sruthi, M. D., & Aravindan, A. (2020). Application of earned value management in residential building project. Materials Today: Proceedings, 33, 524–532.
https://doi.org/10.1016/j.matpr.2020.05.210
16. Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4), 289–302. https://doi.org/10.1016/j.ijproman.2005.10.004
17.Yang, J. B., & Lai, T. H. (2024). Selecting EVM, ESM and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), 4988–5006.