Risk Ranking Water Transmission Lines Project Using Fuzzy Decision Process

Volume 1, Issue 4 - Serial Number 4
September 2019
Pages 40-52

Document Type : Research Article

Author

Technical management

Abstract
Risk management is an integral part of a project's success and is a process that helps identify early problems and thus take steps to prevent them from becoming real problems in the future. In this paper, multi-criteria decision making methods are used as a quantitative approach to prioritize identified risks in the project. Finally, after reviewing the problem conditions, a multi-criteria decision-making method for ranking the project risks in fuzzy mode is introduced and the application of this approach in the water transmission line industry by using fuzzy TOPSIS method as a case study of the tropical design project - Part 2 Is located.

Keywords

1 - Pan, J., Teklu, Y., Rahman, S. and Castro, A. D. (2111). "An Interval-based MADM Approach to the
Identification of Candidate Alternatives in Strategic Resource Planning." IEEE Transactions on Power
Systems, Vol.15, No. 4, PP. 1441-1446.
2 - North, D. W. (1995). "Limitations, Definitions, Principles and Methods of Risk Analysis." OIE Review of
Science and Technology. Epiz., Vol.14, No. 4.
3- Zandin, K. B. (2111). Maynard’s Industrial Engineering Handbook, 5th Edition, McGraw-Hill.
4 - TECHNICAL REPORT: ISO/IEC TR 3۹1998-1333۱(E) Information technology — Guidelines for the management of
IT Security -Part 3:Techniques for the management of IT Security.
5 - Klein, J. H. and Cork, R. B. (1998). "An approach to technical risk assessment." International Journal of
Project Management, Vol.16, No.6, PP. 345-351.
6 - McDermott, R. E., Mikulak, R. J. and Beauregard, M. R. (1996). "The basics of FMEA." Quality Resources,
PP. 12.
7.Lee, Y. and Wu, W.(2115). “Development strategic for competency models.” International Trade Department, Ta Hwa
Institute of Technology, Taiwan.
8. AriapourA ,A. and VeisanlooB ,F. and AsgariC ,M.(2114).” An Application of Fuzzy TOPSIS Method for Plant
Selection in Rangeland Improvement (Case Study: Boroujerd Rangeland, Lorestan Province, Iran)”
9. Kuo, T.(2117). “A modified TOPSIS with a different ranking index”. European Journal of Operational Research, Volume
261, Issue 1, 1 July 2117, Pages 152-161.
11. Walczak, D. and Rutkowska, A.(2117). Project rankings for participatory budget based on the fuzzy TOPSIS method.
European Journal of Operational Research, Volume 261, Issue 2, 16 July 2117, Pages 716-714.
12. Jabal Ameli, Mohammad Saeed; Rezaeifar, Ayat; & Chai Bakhsh Langroudi, Ali. (2006). Ranking Project Risks Using a Multi-Criteria Decision-Making Process. Journal of the Faculty of Engineering, Vol. 41, No. 7, pp. 863–871.
  • Receive Date 23 August 2019
  • Revise Date 16 October 2019
  • Accept Date 17 September 2019
  • First Publish Date 17 September 2019
  • Publish Date 23 August 2019