Abdalla, M., Alarabi, L., & Hendawi, A. (2021). Crisis management art from the risks to the
control: a review of methods and directions. Information, 12(1), 18.
Afrasiab Kheirdast, S. A., Jowzi, S., Rezayan, M., & Mirza Ebrahim Tehrani, M. (2024).
Locating emergency shelters in District 19 of Tehran using multi-criteria decision-making method.
Human and Environment, 1, 35–54.
Akhavan Abdollahi, M. R., Taghvaei, M., & Varesi, H. (2016). Locating shelter and relief centers
from the perspective of crisis management using a combination of TOPSIS technique and AHP-GIS
method in Sabzevar city. Geography and Urban Development, 3(2), 107–126.
Andayesh, M., and Sadeghpour, F., (2014). “The time dimension in site layout planning”,
Automation in Construction, Volume 44, pages129– 139.
Andayesh, M., and Sadeghpour, F., (2014). “The time dimension in site layout planning”,
Automation in Construction, Volume 44, pages129– 139.
Ansarifar, S. (2015). A model for increasing safety and reducing costs in construction projects
through prioritizing proper site layout. National Conference on Architectural Engineering, Civil
Engineering, and Urban Development.
Asadzadeh, M., & Gholipour, Y. (2014). Developing an optimization algorithm for hazardous
layout in construction sites to achieve maximum safety in facility placement. 15th National Civil
Engineering Students Conference.
Bakhshi Lomer, A. R., Rezaeian, M., Rezaei, H., Lorestani, A., Mijani, N., Mahdad, M., ... &
Arsanjani, J. J. (2023). Optimizing emergency shelter selection in earthquakes using a risk-driven large
group decision-making support system. Sustainability, 15(5), 4019.
Batarlienė, Nijolė et al. “The Impact of Human Resource Management on the Competitiveness
of Transport Companies.” Procedia Engineering 187: 110–16, 2017.
Baygan, B., Mehrabian, A., Yousefi Nejad Attari, M., & Doostideilami, M. J. (2024). A Bi‐
Objective Stochastic Model of Locating‐Allocating‐Routing Relief and Rescue in Disaster Response
Conditions: An Accelerated Benders Decomposition. Complexity, 2024(1), 8838354.
Bellenguez-Morineau, O., “Methods to solve multi-skill project scheduling problem”, A
Quarterly Journal of Operations Research, Vol. 6, pp. 85-88, 2008.
Berk, Lauren, Dimitris Bertsimas, Alexander M. Weinstein, and Julia Yan. “Prescriptive
Analytics for Human Resource Planning in the Professional Services Industry.” European Journal of
Operational Research. 2018.
Bernardo F. Almeida , Isabel Correia , Francisco Saldanha-da-Gama, “Priority-based heuristics
for the multi-skill resource constrained project scheduling problem”, Expert Systems with Applications,
Vol.57, pp.91-103, 2016.
Bohlouli, Mahdi et al. “Competence Assessment as an Expert System for Human Resource
Management: A Mathematical Approach.” Expert Systems with Applications 70: 83–102, 2017.
Cherouideh, J., & Shahraki, M. R. (2022). Project selection optimization using the tabu search
algorithm considering time, cost, quality, and resource constraints in the critical chain method. Journal
of Structural and Construction Engineering, 9(3), 43–64.
Cheung, Sai-On and Tong, Thomas Kin-Lun and Tam, Chi-Ming. Site pre-cast yard layout
arrangement through genetic algorithms. In Automation in Construction, Volume 11, No. 1, pages 35–
46. Elsevier, 2002.
39 / عبادی, افشین و قاضی مرادی, مصطفی . -63 ،)1(7 ، نشریه عمران و پروژه، 1404
60
Chirandini, M., Schaerf, A. and Tiozzo, F., “Solving employee timetabling problems with
flexible workload using tabu search”, The 3rd international Conference on the Practice and Theory of
Automated Timetabling , Konstanz, Germany, pp. 298-303, 2002.
Correia , Francisco Saldanha-da-Gama, “The impact of fixed and variable costs in a multi-skill
project scheduling problem: An empirical study”, Computers & Industrial Engineering, Vol. 72,pp. 230-
238, 2014.
Fernandez-Viagas, V., and Framinan, J.M., “Integrated Project Scheduling and Staff Assignment
with Controllable Processing Times”, Hindawi Publishing Corporation, The Scientific World Journal,
2014.
Fırat, M., and Hurkens, C.A.J., “An improved MIP-based approach for a multi-skill workforce
scheduling problem”, Journal of Scheduling, Vol. 15, pp. 363-380, 2012.
Georgiadou, P. S., Papazoglou, I. A., Kiranoudis, C. T., & Markatos, N. C. (2010). Multiobjective
evolutionary emergency response optimization for major accidents. Journal of Hazardous
Materials, 178(1-3), 792-803.
Ghaderi, R., Omidvarfar, S., & Bayramzadeh, N. (2021). Locating temporary shelters for postearthquake
crisis management (Case study: Urmia County). 2nd International Conference and 5th
National Conference on Natural Resources and Environmental Protection, Ardabil.
Ghadiri, A., Sedaghat Shayegan, D., & Amirkardoust, A. (2022). Multi-objective firefly
optimization algorithm for construction site layout planning. Iranian Journal of Optimization, 14(4),
245-260.
Ghasemi, S., Davoudi, A., & Bagheri Tehrani, M. (2023). The impact of project management on
site preparation, equipment, and dismantling (Case study: Mehr Housing Phase 8). International
Conference on Civil Engineering, Architecture, and Information Technology in Urban Life
Guo, K., & Zhang, L. (2022). Multi-objective optimization for improved project management:
Current status and future directions. Automation in Construction, 139, 104256.
Hadi, A., Liu, Y., & Li, S. (2022). Transcending the silos through project management office:
Knowledge transactions, brokerage roles, and enabling factors. International Journal of Project
Management, 40(2), 142-154.
Hamiani, A. Knowledge representation for the site layout problem. InComputing in Civil
Engineering@ sComputers in Engineering Practice, pages 283–289, American Society of Civil
Engineers, 1989.
Hammad, A.W.A., Akbarnezhad, A., Rey ., (2015), “A multi-objective mixed integer nonlinear
programming model for construction site layout planning to minimise noise pollution and transport
costs”, Automation in Construction, Volume 53, pages58– 68.
Hammad, A.W.A., Akbarnezhad, A., Rey ., (2015), “A multi-objective mixed integer nonlinear
programming model for construction site layout planning to minimise noise pollution and transport
costs”, Automation in Construction, Volume 53, pages58– 68.
Hesami, S., Akbari Kafash, E., & Tila, N. (2012). Prioritizing factors affecting the equipment of
construction sites using AHP and ANP approaches. 2nd National Conference on Construction
Engineering and Management, Amirkabir University of Technology.
Htoo, T. T., Dodanwala, T. C., & Santoso, D. S. (2023). Project management maturity and
performance of building construction projects in Myanmar. Practice Periodical on Structural Design and
Construction, 28(1), 04022070.
Huang, C., and Wong, C.K., (2015), “Optimisation of site layout planning formultiple
construction stageswith safety considerations and requirements”, Automation in Construction, Volume
53, pages58– 68.
39 / عبادی, افشین و قاضی مرادی, مصطفی . -63 ،)1(7 ، نشریه عمران و پروژه، 1404
61
Huang, C., and Wong, C.K., (2015), “Optimisation of site layout planning formultiple
construction stageswith safety considerations and requirements”, Automation in Construction, Volume
53, pages58– 68.
Jifu Liu, Yida Fan, Piejun Shi, (2011), Response to a high-Altitude Earthquake: The Yushu
Earthquake example, Int J. Disaster risk sci,2(1),43-53.
Kawanaka, H., Yamamoto, K., Yoshikawa, T., Shinogi, T. and Tsuruoka, S., “Genetic algorithm
with the constraints for nurse scheduling problem”, Congress on Evolutioary Computation, pp. 1123-
1130, 2001.
Kazemipoor, H., Tavakkoli-Moghaddam, R., and Shahnazari-Shahrezaei, P., “Solving a mixedinteger
linear programming model for a multi-skilled project scheduling problem by simulated annealing
”, Management Science Letters, Vol. 2, pp. 681-688, 2012.
Kerzner, H. (2019). Using the project management maturity model: strategic planning for project
management. John Wiley & Sons.
Kerzner, H. (2022). Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Khatami Firoozabadi, S. M. A., Bagheri, M., & Yousefi, S. (2017). Scheduling construction
projects using a combination of multi-objective programming and simulation-based optimization.
Research in Production and Operations Management, 8(2), 83–98.
Khodabandeh Shahraki, M., Razavi Haji Agha, S. H., & Daneshvar, M. (2023). Designing a
robust multi-objective model for project scheduling with resource constraints and time-cost trade-offs.
Industrial Management, 15(2), 223–243
Khoshtaba, M., & Eshtehardiann, E. (2012). Planning appropriate construction site layouts for
safety maintenance and cost control. 2nd National Conference on Construction Engineering and
Management, Amirkabir University of Technology.
Kianto, Aino, Josune Sáenz, and Nekane Aramburu. “Knowledge-Based Human Resource
Management Practices, Intellectual Capital and Innovation.” Journal of Business Research 81: 11–20,
2017.
Lian, Jie, ChenGuang Liu, WenJuan Li, and Yong Yin. “A Multi-Skilled Worker Assignment
Problem in Seru Production Systems Considering the Worker Heterogeneity.” Computers & Industrial
Engineering 118: 366–382, 2018.
Liu, C., Zhang, F., Zhang, H., Shi, Z., & Zhu, H. (2023). Optimization of assembly sequence of
building components based on simulated annealing genetic algorithm. Alexandria Engineering Journal,
62, 257-268.
Mahdavi, I., Hemtian, M., Taheri Amiri, M. J., & Ghanat, O. (2019). Providing exact and
metaheuristic solution methods for the project completion time minimization problem considering
budget constraints. Journal of Structural and Construction Engineering, 6(3), 41–56.
Mahmoud Abadi, A., Beheshti Rad, M., & Mohammadzadeh, M. (2014). Harmony search and
equipment layout in construction sites. 1st National Conference on New Horizons in Empowerment and
Sustainable Development in Architecture, Civil Engineering, Tourism, Energy, and Urban & Rural
Environment.
Martinelli A, Cifani G, 2008, Building Vulnerability Assessment and Damage Scenarios in
Celano (Italy) Using a Quick Survey Data-based Methodology, Soil Dynamics and Earthquake
Engineering 28:875-889.
Mehmanchi, E., and Shadrokh, S., “Solving a New Mixed Integer Non-Linear Programming
Model of the Multi-Skilled Project Scheduling Problem Considering Learning and Forgetting Effect on
the Employee Efficiency”, Industrial Engineering and Engineering Management, pp. 400-404, 2013.
39 / عبادی, افشین و قاضی مرادی, مصطفی . -63 ،)1(7 ، نشریه عمران و پروژه، 1404
62
Mostafazadeh, F., Eirdmousa, S. J., & Tavakolan, M. (2023). Energy, economic and comfort
optimization of building retrofits considering climate change: A simulation-based NSGA-III approach.
Energy and Buildings, 280, 112721.
Musliu, N., Schaerf, A. and Slany, W., “Local Search for shift Design”, European Journal of
Operational Research, Vol. 153, No. 1, pp. 51-64, 2002.
Musliu, N., Schaerf, A. and Slany, W., “Local Search for shift Design”, European Journal of
Operational Research, Vol. 153, No. 1, pp. 51-64, 2002.
Nicholas, J. M., & Steyn, H. (2020). Project management for engineering, business and
technology. Routledge.
Ning, X., Ding, L. Y., Lou, H.B., Qi, S. J. (2016), “A multi-attribute model for construction site
layout using intuitionistic fuzzy logic”, Automation in Construction, (Article in press).
Ning, X., Qi, J., Wu, C., (2018), “A quantitative safety risk assessment model for construction
site layout planning”, Safety Sciences, Volume 104, pages 246– 259.
Papadaki, I. N., Chassiakos, A. P., (2016), “ Multi-Objective construction site layout planning
using genetic algorithms”, Procedia Engineering, Volume 164, pages 20– 27.
Papadaki, I. N., Chassiakos, A. P., (2016), “ Multi-Objective construction site layout planning
using genetic algorithms”, Procedia Engineering, Volume 164, pages 20– 27.
Pazani, M., Rezaeifar, O., & Rabizadeh, A. (2022). Project management in civil engineering:
Expert assessment to reduce costs and time with a focus on comprehensive quality improvement. Journal
of Civil Engineering and Projects, 4(4), 62–71.
Pearson, C. M., & Mitroff, I. I. (2019). From crisis prone to crisis prepared: A framework for
crisis management. In Risk management (pp. 185-196). Routledge.
Rashed, T., & Weeks, J. (2003). Assessing vulnerability to earthquake hazards through spatial
multicriteria analysis of urban areas. International Journal of Geographical Information Science, 17(6),
547-576.
Rezaei Banafsheh, M., Valizadeh Kamran, K., & Mohsenzadeh, M. (2019). Determining optimal
locations for establishing multipurpose crisis management bases in high seismic risk areas (North
Tabriz). Geography and Planning, 23(68), 111–133.
Rouhparvar, M., & Ravaneshadnia, M. (2011). Stages of designing construction site layout with
a focus on determining facility dimensions and their interrelations. 2nd International Conference on
Strategic Project Management.
Safar Zadeh, R., Karimi, M., & Alaei Moghaddam, S. (2016). Application of multi-objective
particle swarm optimization algorithm in locating temporary shelter camps in Tehran after an
earthquake. 2nd International Congress on Earth Sciences and Urban Development.
Said, H., and El-Rayes, KH. (2010) "Optimizing the planning of construction site security for
critical infrastructure projects", Automation in Construction, Volume 19, Issue 2, Pages 221-234.
Sajjadi, S. F., Hashemi, S. H., & Kalvandi, S. M. (2018). Optimization of time and cost in the
establishment of temporary settlements after disasters. Amirkabir Journal of Civil Engineering, 50(5),
1003–1014.
Shahebrahimi, Seyedeh Sima, Davood Sedaghat Shaygan, and Aliasghar Amirkardoost.
"Knowledge Management to Investigate the Management of Gas & Oil Industry Gas Compressor
Stations Projects."
Shahnazari-Shahrezaei, P., Tavakkoli-Moghaddam, R., and Kazemipoor, H., “Solving a new
fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm
optimization and elite tabu search”, Intrnational Journal of Advanced Manufacturing Technology, Vol.
64, pp. 1217-1240, 2013.
39 / عبادی, افشین و قاضی مرادی, مصطفی . -63 ،)1(7 ، نشریه عمران و پروژه، 1404
63
Shakeri, E., & Mansouri, M. (2014). Review of the process of site equipment and dismantling.
1st National Congress on Construction and Evaluation of Civil Projects.
Shakroui, H., & Taghavi, B. (2022). Investigation of effective items in the equipment of
industrial and EPC project sites. Journal of Civil Engineering and Project Management, 4(8), 37–47.
Silavi, T. (2010). Seismic vulnerability assessment of Tehran city using intuitionistic fuzzy
models (Master’s thesis in GIS). University of Tehran.
Taheri Amiri, M. J., Haghighi, F. R., Eshtehardi, E. A., & Abasi, A. (2019). Time-cost-quality
trade-off in the critical chain method with multi-mode activities using a multi-objective particle swarm
optimization algorithm. Journal of Structural and Construction Engineering, 6(1), 134–154.
Taheri Amiri, M. J., Hamtian, M., Haghighi, F. R., & Javaheri Barforoushi, M. (2021).
Optimization of internal site layout and its impact on construction project costs using the invasive weed
optimization algorithm. Amirkabir Journal of Civil Engineering, 53(2), 495–514.
Taheri Amiri, M. J., Hemtian, M., & Jooj, M. (2021). Optimization of time, cost, and quality
with interrupted activities in civil projects using the invasive weed optimization algorithm. Amirkabir
Journal of Civil Engineering, 53(3), 807–822.
Tavakkoli-Moghaddam, R., Eslami, SH. “A mathematical model for manpower scheduling
solved by genetic algorithm” Sharif of Science and Technology, Vol. 12, No. 57B, pp.21-31, 2006.
Tavakkoli-Moghaddam, R., Fatemi-Ghomi, S.M.T., Afsari, F. and Safaei, M., “A mathematical
model for manpower scheduling solved by tabu search”, Amirkabir Journal of Science and Technology,
Vol. 16, No. 61B, pp.13-22, 2005.
Tommelein, ID and Levitt, RE and Hayes-Roth, B. SightPlan model for site layout. In Journal of
Construction Engineering and Management, Volume 118, No. 4, pages=749–766,American Society of
Civil Engineers, 1992.
Tran Thi Hoang, G., Dupont, L., & Camargo, M. (2019). Application of decision-making
methods in smart city projects: a systematic literature review. Smart Cities, 2(3), 433-452.
Wut, T. M., Xu, J. B., & Wong, S. M. (2021). Crisis management research (1985–2020) in the
hospitality and tourism industry: A review and research agenda. Tourism Management, 85, 104307.
Yi, W., Chi, H., Wang, S., (2018), “Mathematical programming models for construction site
layout problems”, Automation in Construction, Volume 85, pages 241– 248.