Construction projects are frequently exposed to simultaneous schedule and cost deviations, while conventional monitoring may not reveal the relationship between planned work, physical progress and actual expenditure. This study develops and evaluates an integrated time–cost control framework based on Earned Value Management (EVM) for a National Housing project in Abhar, Iran. The research is applied in purpose, descriptive–analytical in nature, and based on a case-study design. The project comprises three residential blocks (M6, M7 and M8), which are treated as one integrated control unit. Schedule, reported physical progress and cumulative cost information were organized using Microsoft Project and Excel. At the principal control point, the total budget (BAC) is 25 billion toman, Planned Value (PV) is 10.25 billion toman, Earned Value (EV) is 6.125 billion toman, and Actual Cost (AC) is 7.35 billion toman. The resulting SPI is approximately 0.60 and CPI is approximately 0.83, indicating simultaneous schedule and cost underperformance. A transparent what-if corrective scenario is then evaluated by targeting SPI=0.85 and CPI=0.95 while keeping the baseline PV unchanged; the resulting EV and AC are approximately 8.71 and 9.17 billion toman, respectively. Forecasts are presented only with explicit formulas and assumptions. The contribution of the study is not a new EVM formula, but an implementable control cycle linking baseline planning, progress measurement, EVM diagnosis, qualitative cause analysis, and corrective decision-making for a multi-block residential project. Because the original detailed EVM worksheet was unavailable during reconstruction, the reported aggregate control-point progress is retained as the primary EV basis and its provenance is explicitly disclosed.
کلیدواژهها English