7. Al-Momani A. 2111. Construction delay: a quantitative analysis. Int J Project Mngmnt. 78(7):57–59.
2. Arain F, Assaf S, Pheng L. 2112. Causes of discrepancies between design and construction. Arch Sci Rev.
21(8):281–229.
8. Best, R.; de Valence, G. (7999) ―Getting it Right at the Start‖, Building in Value: Pre-design Issues Best, R. and de
Valence, G.(Eds.). London, pp. 7-9.
2. Blomberg, J. (7998) ―Myter om Projekt‖, Nerenius and Santerus, Stockholm.
5. Chin, G. (2112). Agile project management: how to succeed in the face of changing project requirements.
AMACOM Div American Mgmt Assn.
2. Collyer, S., Warren, C., Hemsley, B., Stevens, C., 2171. Aim, fire, aim —project planning styles in dynamic
environments. Proj. Manag. J. 27 (2),718–727.
1. Conference on Operations and Global Competitiveness - EurOMA, Budapest, Hungary.
8. Conforto E, Rebentisch E, Amaral D. 2172. Project Management Agility Global Survey. Cambridge, MA:
Massachusetts Institute of Technology, Consortium for Engineering.
www.cpjournals.com ISSN:6262-155X )Civil & Project Journal)CPJ(( نشریه عمران و پروژه
ػب دٚ ،ْ دٚسٜ 2، ؿ بٕسٜ 11 ، ثٟ 1399 ،ؿ بٕسٜ پیبپی 21 -،کفحٝ 42 تب کفحٝ 55
45
9. Cooke J. 2172. Everything you want to know about Agile: how to get Agile results in a less-than-Agile
organization.Ely, Cambridgeshire: IT Governance Ltd.
71. Dybå, T., Dingsøyr, T., 2118. Empirical studies of agile software development: a systematic review. Inf. Softw.
Technol. 51 (9), 888–859.
77. Enshassi A, Arain F, Al-Raee S. 2171. Causes of variation orders in construction projects in the Gaza Strip. J Civil
Eng Mngmnt. 72(2):521–557.
72. Gandomani, T. J., Zulzalil, H., Ghani, A. A. A., Sultan, A. B. M., & Nafchi, M. Z. (2178). Obstacles in moving to
agile software development methods; at a glance. Journal of Computer Science, 9(5), 221.
78. Gkritza K, Labi S. 2118. Estimating cost discrepancies in highway contracts: Multistep econometric approach. J
Constr Eng Manage. 782(72):958–922.
72. Gustavsson, T. (2178). Agile-konsten att slutföra projekt. TUK Förlag AB.
75. Hanna A, Camlic R, Peterson P, Nordheim E. 2112. Quantitative definition of projects impacted by change orders.
J Constr Eng Manag. 728(7):51–22.
72. Hoda, R., Noble, J., & Marshall, S. (2118, April). Agile project management. In New Zealand Computer Science
Research Student Conference (Vol. 2, pp. 278-227).
71. Howell, G. A.; Koskela, L. (2111) ―Reforming Project Management: The Role of Lean Construction‖, 8th Annual
Conference on Lean Construction, Brighton, UK. IGLC.
78. Hwang B, Low L. 2172. Construction project change management in Singapore: Status, importance and impact.
Int J Project Manag. 81(1):871–822.
79. Jadhav O, Bhirud A. 2175. An analysis of causes and effects of change orders on construction projects in Pune. Int
J Eng Res General Sci. 8(2):195–199.
21. Jawad R, Abdulkader R, Ali A. 2119. Variation orders in construction projects. J Eng Appl Sci. 2(8):711–712.
27. Kagioglou, M. Cooper, R. Aouad, G. Hinks, J. Sexton, M., et al. (7998) ―Final Report: Generic Design and
Construction Process Protocol‖, University of Salford, UK.
22. Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (7991). Factors influencing construction time and
cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 75(7), 88-92.
28. Keane P, Sertyesilisik B, Ross A. 2171. Variations and change orders on construction projects. J Leg Aff Dispute
Resolut Eng Constr. 2(2):89–92.
22. Koch, C. (2115) ―Failures in Building Operations - An Occasion for Learning?‖ International
25. Manzoor Arain F, Sui Pheng L. 2115. The potential effects of variation orders on institutional building projects.
Facilities. 28(77/72):292–571.
22. Meng, X. (2172). The effect of relationship management on project performance in construction. International
Journal of Project Management, 81(2), 788-798.
21. Morriss, P. (7997) ―Project Specification and Initiation‖, Guidelines for the Management of Major Construction
Projects, National Economic Development Office, HMSO, London.
28. Owen, Robert, Koskela, Lauri, Henrich, Guilherme and Codinhoto, Ricardo (2112) Is Agile Project Management
Applicable to Construction? In: Proceedings IGLC-72, July 2112, Santiago, Chile. IGLC, pp. 57-22.
29. Oyewobi L, Jimoh R, Ganiyu B, Shittu A. 2172. Analysis of causes and impact of variation order on educational
building projects. J Facil Manag. 72(2):789–722.
81. Ritter, T., 2111. Public sector IT projects have only 81: success rate. CIO for Department for Work and Pensions
(Retrieved from http://www.computerweekly.com/blogs/public-sector/2111/15/public-sector it-projectshave.html).
87. Senouci A, Alsarraj A, Gunduz M, Eldin N. 2171. Analysis of change orders in Qatari construction projects. Int J
Constr Manag. 71(2):281–292.
82. Serrador, P., Turner, J.R., 2175. The relationship between project success and project efficiency. Proj. Manag. J.
22 (7).
88. Sohi A, Hertogh M, Bosch-Rekveldt M, Blom R. 2172. Does lean & agile project management help coping with
project complexity? Procedia Soc Behav Sci. 222:252–259.
82. Sun M, Meng X. 2119. Taxonomy for change causes and effects in construction projects. Int J Project
Manag.21(2):521–512.
85. Yasaman Arefazar, Ahad Nazari, Mohammad Reza Hafezi & Sayyed Amir Hossain Maghool (2179): Prioritizing
agile project management strategies as a change management tool in construction projects, International Journal of
Construction Management, DOI:71.7181/75228599.2179.7222151
82. Yllen Johansson M. 2172. Agile project management in the construction industry: An inquiry of the oppurtunities
in construction projects. Sweden: KTH Royal Institute of Technology Stockholm.