Asta, S., Karapetyan, D., Kheiri, A., Özcan, E., & Parkes, A. J. (2016). Combining Monte-Carlo and hyper-heuristic
methods for the multi-mode resource-constrained multi-project scheduling problem. Information Sciences, 373, 476-498.
Belenky, A. S. (2012). A Boolean programming problem of choosing an optimal portfolio of projects and optimal schedules
for them by reinvesting within the portfolio the profit from project implementation. Applied Mathematics Letters, 25(10),
1279-1284.
Beşikci, U., Bilge, Ü., & Ulusoy, G. (2015). Multi-mode resource constrained multi-project scheduling and resource
portfolio problem. European Journal of Operational Research, 240(1), 22-31.
Chen, J., & Askin, R. G. (2009). Project selection, scheduling and resource allocation with time dependent returns.
European Journal of Operational Research, 193(1), 23-34.
Deng, Z., Bai, Y., Fang, S. C., Tian, Y., & Xing, W. (2013). A branch-and-cut approach to portfolio selection with marginal
risk control in a linear conic programming framework. Journal of systems science and systems engineering, 22(4), 385-400.
Dikmen, I., Birgonul, M. T., & Ozorhon, B. (2007). Project appraisal and selection using the analytic network process.
Canadian Journal of Civil Engineering, 34(7), 786-792.
Farris, J. T. (2001). The barriers to using urban infill development to achieve smart growth.
Geiger, M. J. (2017). A multi-threaded local search algorithm and computer implementation for the multi-mode, resourceconstrained
multi-project scheduling problem. European Journal of Operational Research, 256(3), 729-741.
Gyourko, J. E., & Rybczynski, W. (2000). Financing new urbanism projects: Obstacles and solutions. Housing Policy
Debate, 11(3), 733-750.
Jafarzadeh, M., Tareghian, H. R., Rahbarnia, F., & Ghanbari, R. (2015). Optimal selection of project portfolios using
reinvestment strategy within a flexible time horizon. European Journal of Operational Research, 243(2), 658-664.
Janssen, J., Manca, R., & Volpe, E. (2013). Mathematical finance: deterministic and stochastic models. John Wiley & Sons.
Kolisch, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29(3), 249-272.
Li, X., Fang, S. C., Guo, X., Deng, Z., & Qi, J. (2016). An extended model for project portfolio selection with project
divisibility and interdependency. Journal of Systems Science and Systems Engineering, 25, 119-138.
Li, X., Wang, Y., Yan, Q., & Zhao, X. (2019). Uncertain mean-variance model for dynamic project portfolio selection
problem with divisibility. Fuzzy Optimization and Decision Making, 18, 37-56.
Liberatore, M. J., Pollack-Johnson, B., & Smith, C. A. (2001). Project management in construction: Software use and
research directions. Journal of construction engineering and management, 127(2), 101-107.
Lim, A. E., & Wimonkittiwat, P. (2014). Dynamic portfolio selection with market impact costs. Operations Research
Letters, 42(5), 299-306.
Lova, A., Maroto, C., & Tormos, P. (2000). A multicriteria heuristic method to improve resource allocation in multiproject
scheduling. European journal of operational research, 127(2), 408-424.
Markowitz, H. M. (1952). Portfolio selecti -91.
Markovitz, H. M. (1959). Portfolio selection: Efficient diversification of investments. John Wiley.
Mirkhorsandi, S. M., Khosravi, H., Davoodi, A., & Movahedifar, S. M. (2024). Civil and Project, 5(10), 11-26.
26
Myers, S. C. (1977). Determinants of corporate borrowing. Journal of financial economics, 5(2), 147-175.
Mirkhorsandi Langaroudi, S. M., Khosravi, H., Davoodi, A., & Movahedifar, S. M. (2022). Resource planning for the
problem of selection and scheduling of self-financed project portfolio in project-oriented organizations. Journal of New
Researches in Mathematics, 32, 115-130
Mirkhorsandi Langaroudi, S. M., Khosravi, H., Davoodi, A., & Movahedifar, S. M. (2023). Cash holding management for
self-financing phase-able and non-phase-able project portfolio selection and scheduling problems. The Engineering
Economist, 1-17. DOI: 10.1080/0013791X.2023.2172242
Ott, S. H., Hughen, W. K., & Read, D. C. (2012). Optimal phasing and inventory decisions for large-scale residential
development projects. The Journal of Real Estate Finance and Economics, 45, 888-918.
Petit, Y. (2012) ‘Project portfolios in dynamic environments: Organizing for uncertainty’, International Journal of Project
Management. Elsevier, 30(5), pp. 539–553.
Engineering. NRC Research Press, 37(8), pp. 1082–1093.
Ranjbar, M., Nasiri, M. M., & Torabi, S. A. (2022). Multi-mode project portfolio selection and scheduling in a buildoperate-
transfer environment. Expert Systems with Applications, 189, 116134.
Shafahi, A., & Haghani, A. (2018a). Project selection and scheduling for phase-able projects with interdependencies among
phases. Automation in Construction, 93, 47-62.
Shafahi, A. and Haghani, A. (2018b). Project selection and scheduling for phase-able projects with interdependencies
among phases’, Automation in Construction. Elsevier, 93(September 2017), pp. 47–62. doi: 10.1016/j.autcon.2018.05.008.
Shoup, D. (2008). Graduated density zoning. Journal of Planning Education and Research, 28(2), 161-179.
Toffolo, T. A., Santos, H. G., Carvalho, M. A., & Soares, J. A. (2016). An integer programming approach to the multimode
resource-constrained multiproject scheduling problem. Journal of Scheduling, 19, 295-307.
Wang, B., & Song, Y. (2016). Reinvestment strategy-based project portfolio selection and scheduling with time-dependent
budget limit considering time value of capital. In Proceedings of the 2015 International Conference on Electrical and
Information Technologies for Rail Transportation: Transportation (pp. 373-381). Springer Berlin Heidelberg.
Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Vanden Berghe, G., & Verstichel, J. (2016). The multi-mode
resource-constrained multi-project scheduling problem: The MISTA 2013 challenge. Journal of Scheduling, 19, 271-283.
Xue, X., Wang, S., & Lu, B. (2015). Computational experiment approach to controlled evolution of Zarjou, M., &
Khalilzadeh, M. (2022). Optimal project portfolio selection with reinvestment strategy considering sustainability in an
uncertain environment: a multi-objective optimization approach. Kybernetes, 51(8), 2437-2460.
Zhao, T., & Tseng, C. L. (2003). Valuing flexibility in infrastructure expansion. Journal of infrastructure systems, 9(3), 89-
97.
Zhong, Z., Li, X., Liu, X., & Lau, W. (2019). Opportunity cost management in project portfolio selection with
divisibility. Journal of the Operational Research Society, 70(7), 1164-1178.
Zuluaga, A., Sefair, J. A., & Medaglia, A. L. (2007, April). Model for the selection and scheduling of interdependent
projects. In 2007 IEEE Systems and Information Engineering Design Symposium (pp. 1-7). IEEE.