[1] Ndekugri, I., N. Braimah, and R. Gameson, Delay analysis within construction contracting
organizations. Journal of construction engineering and management, 2008. 134(9): p. 692-700.
[2] Çevikbaş, M. and Z. Işık, An overarching review on delay analyses in construction projects. Buildings,
2021. 11(3): p. 109.
[3] Rauzana, A. and W. Dharma, Causes of delays in construction projects in the Province of Aceh,
Indonesia. PloS one, 2022. 17(1): p. e0263337.
[4] Shrivas, A. and H.K. Singla, Analysis of interaction among the factors affecting delay in construction
projects using interpretive structural modelling approach. International Journal of Construction
Management, 2022. 22(8): p. 1455-1463.
[5] Anjomshoa, E., Investigation of lightweight gypsum based on montmorillonite nanoclay with enhanced
insulation properties. International Journal of Building Pathology and Adaptation, 2024.
https://doi.org/10.1108/IJBPA-10-2023-0155
[6] Yap, J.B.H., P.L. Goay, Y.B. Woon, and M. Skitmore, Revisiting critical delay factors for construction:
Analysing projects in Malaysia. Alexandria Engineering Journal, 2021. 60(1): p. 1717-1729.
[7] Egwim, C.N., H. Alaka, L.O. Toriola-Coker, H. Balogun, and F. Sunmola, Applied artificial intelligence
for predicting construction projects delay. Machine Learning with Applications, 2021. 6: p.
100166.
[8] Jahangoshai Rezaee, M., S. Yousefi, and R.K. Chakrabortty, Analysing causal relationships between
delay factors in construction projects: A case study of Iran. International Journal of Managing
Projects in Business, 2021. 14(2): p. 412-444.
[9] Anjomshoa, E., The application of building information modeling (BIM) system in the smartification of
green and sustainable buildings. Engineering, Construction and Architectural Management, 2024.
https://doi.org/10.1108/ECAM-03-2024-0291
28 / برخورداری دشتخاکی, علیرضا و طباطبایی میرحسینی, رامین . -11 ،)1(7 نشریه عمران و پروژه، 1404
https://doi.org/10.22034/cpj.2025.522018.1365
27
[10] Maqsoom, A., R.M. Choudhry, M. Umer, and T. Mehmood, Influencing factors indicating time delay
in construction projects: Impact of firm size and experience. International Journal of Construction
Management, 2021. 21(12): p. 1251-1262.
[11] Chadee, A., H. Ali, S. Gallage, and U. Rathnayake, Modelling the implications of delayed payments
on contractors’ cashflows on infrastructure projects. 2023.
[12] Yaqin, H.N., H.T. Tjendani, and B. Witjaksana, Analysis of The Acceleration of Time and Cost of
Implementing Building Construction Projects Using The Critical Path Method (CPM) Method.
Devotion: Journal of Research and Community Service, 2023. 4(2): p. 336-346.
[13] Anjomshoa, E., Key performance indicators of construction companies in branding products and
construction projects for success in a competitive environment in Iran. Engineering, Construction
and Architectural Management, 2024. 31(5): p. 2151-2175. https://doi.org/10.1108/ECAM-08-
2023-0852
[14] Van, T.N. and T.N. Quoc, Research trends on machine learning in construction management: A
scientometric analysis. Journal of Applied Science and Technology Trends, 2021. 2(02): p. 124-
132.
[15] Viles, E., N.C. Rudeli, and A. Santilli, Causes of delay in construction projects: a quantitative analysis.
Engineering, Construction and Architectural Management, 2020. 27(4): p. 917-935.
[16] Durdyev, S. and M.R. Hosseini, Causes of delays on construction projects: a comprehensive list.
International journal of managing projects in business, 2020. 13(1): p. 20-46.
[17] Kim, S., S. Chang, and D. Castro-Lacouture, Dynamic modeling for analyzing impacts of skilled labor
shortage on construction project management. Journal of Management in Engineering, 2020.
36(1): p. 04019035.
[19] Mirzaei, M. (2016). Identification and prioritization of delay causes in industrial projects
based on AHP approach. The 1st Comprehensive International Conference on Engineering
Sciences in Iran, Anzali, Conference Secretariat, University of Guilan, University of Tabriz.
(In Persian)
[20] Danesh, H. (2015). Investigation of the impact of project management on cost management
in the Varzeghan earthquake reconstruction project (East Azerbaijan Province, Iran) – Case
study: Mika Dezh Construction Company. International Conference on Management and
Humanities, Dubai, UAE, Capital Vira Institute of Creative Managers. (In Persian)
[21] Aghamolaei, M., & Mohammadi, M. (2019). Investigation of delay causes in construction
projects in Kerman Province. The 3rd Scientific Conference on New Achievements in
Management, Accounting, and Economics Studies of Iran, Ilam, Aso System Research
Institute. (In Persian)
[22] Gholami, I., & Rayanpour, E. (2015). Evaluation and analysis of contractor- and clientinduced
delays in the widening and improvement project of the Pol Sefid–Qaemshahr road.
The 2nd International Conference on Research in Science and Technology, Istanbul, Turkey,
Karin Elite Conference Institute. (In Persian)
[23] Khosravi, A., & Samsami, S. (2016). A system dynamics model for project management (with
a case study). The 13th International Conference on Industrial Engineering, Babolsar,
University of Science and Technology of Mazandaran. (In Persian)
[24] Mousavi, S. M. (2019). Delay patterns in construction projects and ranking of factors affecting
project delays. The 2nd International Conference on Civil Engineering, Architecture, and
Urban Development Management in Iran, Tehran, Maragheh University of Technology. (In
Persian)
28 / برخورداری دشتخاکی, علیرضا و طباطبایی میرحسینی, رامین . -11 ،)1(7 نشریه عمران و پروژه، 1404
https://doi.org/10.22034/cpj.2025.522018.1365
28
[25] Akrami, A. A. (2014). Consequences of inappropriate preparation of Work Breakdown
Structure (WBS) and project scheduling in construction projects. The 1st National
Conference on Civil Engineering, Architecture, and Sustainable Development, Yazd,
Payame Noor University of Yazd. (In Persian)
[26] Ahmadvand, M., Eghbali, H., & Habibi Lassebi, N. (2019). A model for evaluating factors
causing delays and cost overruns in construction projects. The 6th National Conference on
Applied Research in Civil Engineering, Architecture, and Urban Management, Tehran,
Khajeh Nasir al-Din Tusi University of Technology. (In Persian)
[27] Riazi, M. E. (2019). Identification and ranking of delay factors in Tehran Municipality
construction projects using the Analytic Hierarchy Process (AHP) – Case study: District 13
of Tehran Municipality. (In Persian)
[28] Shayesteh Bialandi, R., Ghalenoee, M., & Rezaei Nik, E. (2017). Investigation of time–cost–
quality trade-off in project scheduling. The 3rd International Conference on Architecture,
Civil Engineering, and Urban Planning at the Beginning of the Third Millennium, Tehran,
Alborz University; Alborz Province Association of Architecture and Urban Planning;
AnaBaftShahr Design and Role Consortium; Bana Shahr Paydar Institute; Salvi Nasr
Cultural and Artistic Institute; University of Tabriz; Tabriz Art University; Islamic Azad
University, Nou Branch. (In Persian)
[29] Saeidi, Sh., & Alizadeh Aminlooie, S. (2016). Project scheduling with linear programming
considering resource constraints and risk-taking. The 3rd International Conference on
Knowledge-Based Engineering and Innovation, Tehran, Payame Noor University of Tehran
Province; Qods City Municipality; KBEI Publishing. (In Persian)
[30] Flyvbjerg, Bent, Skamris holm, mette, k, BUHL, søren l, (2004) What Causes Cost Overrun
in Transport Infrastructure Projects?, Transport Reviews: A Transnational Transdisciplinary
Journal, 24:1, 3-18
[31] Ralph, D. Ellis, Jr. H. Randolph, Thomas, (2003), THE ROOT CAUSES OF DELAYS IN
HIGHWAY CONSTRUCTION,Submitted for Presentation at the 82nd Annual Meeting of
the Transportation Research Board, Washington D.C.
[32] Sweis G., Sweis R., Abu Hammad A., Shboul A., (2008), Delays I construction projects: The
case of Jordan, International Journal of Project Management, Volume 26, Issue 6, Pages 665-
674.
[33] Doloi. H, Sawhney. A, Iyer.K.C, Rentala. S.(2012) Analysing factors affecting delays in
Indian construction projects, International Journal of Project Management 30 , 479–489.
[34] San Cristóba. J (2014) Cost allocation between activities that have caused delays in a project
using game theory, Procedia Technology 16 ( 2014 ) 1017 – 1026