This research aims to provide a model to compress the schedule by selecting the optimal activities in terms of cost, time, quality and risk using TOPSIS method. The current research is applied in terms of results and its results can be used in the direction of developing project management techniques and moving towards the application of engineering techniques in improving the performance of organizations implementing construction and investment projects. A library is divided. The library method was used to collect information related to the subject literature and the background of the research, and the field method was used to collect information to investigate the research objectives. In this research, the data collection tool is a questionnaire. The statistical population of the research for the questionnaire included 5 construction experts from the private sector, among whom the questionnaire was distributed. In an optimization problem with balancing time, cost, quality and risk, the appropriate implementation methods for performing a set of activities of a project from the beginning to the end should be chosen in such a way that the factors of time, cost, quality and risk of the whole project implementation are optimized. In this research, TOPSIS algorithm was used to solve the problem.
کلیدواژهها [English]